Long Span Precast Beams at the Marsa Sports Complex
The construction complexities at the Marsa Sports Complex prompted the utilisation of precast elements, expediting construction and simplifying temporary works. With spans exceedin
Piling at the Marsa Sports Complex
Comprehensive testing protocols were in place, which included evaluating fresh concrete, taking cube samples from each truck, and extracting cores from the piles themselves. Streng
Design and Execution of Cross-Bracing Connections at the Marsa Sports Complex
Addressing lateral loads at the Marsa Sports Complex required the use of cross-bracing to ensure structural rigidity behind the continuous glass curtain wall, while maintaining tra