Tandem lift of Luqa Pedestrian Bridge
In the early hours of today, the prefabricated steel pedestrian bridge has landed on its bearings to its permanent position over the abutments in Luqa, which had been in constructi
Opening Luqa Pedestrian Bridge
After intensive work following the bridge lifting experience reported in our last Blog post, the access over the bridge is now open to the public. It has been days of casting co
Design and Execution of Cross-Bracing Connections at the Marsa Sports Complex
Addressing lateral loads at the Marsa Sports Complex required the use of cross-bracing to ensure structural rigidity behind the continuous glass curtain wall, while maintaining tra