After intensive work following the bridge lifting experience reported in our last Blog post, the access over the bridge is now open to the public. It has been days of casting concrete, installing fixtures, detailing, and supervising works which led to a result we are proud of.
Follow Infrastructure Malta link to follow the experience:
4 Comments
control_jlz
sdfdsd
control_jlz
comment
Michela
trial
control_jlz
test
Comments are closed.